schedule.xl
|
CS 349, Summer '11 |
|
|
|
Updated 5/21/2011 |
|
|
|
|
|
|
Cumm. |
Class |
Date |
Day |
Topic |
Reading |
Problems |
Labs |
Lecturer |
REB |
DROH |
Notes |
1 |
1 |
05/24 |
Tue |
Instruction Set Arch. |
4.1 |
4.1 to 4.5 |
L1a out |
reb |
|
|
|
2 |
2 |
05/26 |
Thu |
Logic Design |
4.2 |
4.6 to 4.10 |
|
reb |
|
|
|
3 |
3 |
06/01 |
Tue |
Sequential Impl. |
4.3 |
4.11 to 4.25 |
L1a due, L1b out |
reb |
|
|
|
4 |
4 |
06/03 |
Thu |
Pipelined Impl. I |
4.4 - 4.5.5 |
4.26 to 4.27 |
|
reb |
|
|
|
5 |
5 |
06/08 |
Tue |
Pipelined Impl. II |
4.5.6 - 4.5.11 |
4.28 to 4.40 |
L1b due, L1c out |
reb |
|
|
|
6 |
6 |
06/10 |
Thu |
Modern Proc. Design |
4.5.12 - 4.6 |
4.41 to 4.42 |
|
reb |
|
|
|
|
|
06/24 |
Thu |
n/a |
|
|
L1c due |
|
|
|
|
Last Updated on 5/21/11
By Randal E. Bryant