He will not accept commissions or allowances, directly or indirectly,
from contractors or other parties dealing with his client or employer in
connection with work for which he is responsible.
C16. (Part 1)
[See Codes
10(b). (Part 1),
II.4.c. (Part 2),
III.5.b. (Part 1)
]
- Code is relevant when:
- Engineer has an employer
AND
Engineer is responsible for engineering work with the employer
- Code is violated when:
- Engineer accepts a commission or allowance (directly or indirectly) from contractors or other parties in connection with the engineering work
- Code is not violated when
- Engineer does not accept a commission or allowance (directly or indirectly) from contractors or other parties in connection with the engineering work
C16. (Part 2)
[See Codes
10(b). (Part 2),
II.4.c. (Part 4),
III.5.b. (Part 2)
]
- Code is relevant when:
- Engineer has a client
AND
Engineer is responsible for engineering work with the client
- Code is violated when:
- Engineer accepts a commission or allowance (directly or indirectly) from contractors or other parties in connection with the engineering work
- Code is not violated when
- Engineer does not accept a commission or allowance (directly or indirectly) from contractors or other parties in connection with the engineering work