R16:28.

He will not accept financial or other considerations, including free engineering designs, from material or equipment suppliers for specifying their product.

[See Codes 10(a)., III.5.a. ]

Code is relevant when:
Engineer specifies a material or equipment suppliers product
Code is violated when:
Engineer accepts financial consideration for specifying the product
OR
Engineer accepts other considerations, including free engineering designs, for specifying the product
Code is not violated when
Engineer does not accept financial consideration for specifying the product
AND
Engineer does not accept other considerations, including free engineering designs, for specifying the product

[Index to All Codes] [Back to previous canon or rule] [Forward to next canon or rule]