He will not compete with another engineer on the basis of charges for
work by underbidding, through reducing his normal fee after having been
informed of the charges named by the other.
[See Code
III.7. (Part 1)
]
- Code is relevant when:
- Engineer competes with another engineer for a project or engineering work
AND
Engineer is informed of the fees proposed by the other engineer
- Code is violated when:
- Engineer underbids (i.e., he reduces his normal fee) for the project or engineering work
- Code is not violated when:
- Engineer does not underbid for the project or engineering work
[Index to All Codes]
[Back to previous canon or rule]
[Forward to next canon or rule]