Schedule
Design and Implementation
Integration
Expected Date | Description | Status | Relevant Links |
Jan 20 1997 | Switch to enable choice of old or new architecture | Integrated | |
Nov 7 1996 | Prompt: respond to long periods of inactivity | Integrated | |
Jan 31 1997 | Unstick behavior: backchannel or help on word | Integrated
| |
Feb 5 1997 | TakeTurn: give feedback on first uncredited word | Integrated
| |
Feb 5 1997 | Usability test: Klaus Zechner | Completed | |
Feb 10 1997 | Usability test: CMU Outreach students | Completed | |
Feb 10 1997 | Usability critique: CMU HCI Seminar Class | Completed | |
Mar 15 1997 | Fix major usability bugs | Completed | |
Evaluation
Expected Date | Description | Status | Relevant Links |
Mar 31 1997 | Evaluation, Argumentative: Literature review of human-human and human-computer interaction, especially the role of time-sensitive behavior | Completed, needs revision
| |
Mar 31 1997 | Evaluation, Argumentative: Comparison of architecture to proposed rules governing human-human interaction | Conceptualized
| |
Feb 15 1997 | Evaluation, Existential: Existence and demonstration of prototype system | Tested
| |
Mar 18-19 1997 | Evaluation, Qualitative: Videotape students using tutor at Fort Pitt Elementary | Completed
| |
Apr 15 1997 | Evaluation, Qualitative: Videotape expert critiqueing student-tutor interaction | Completed
| |
Mar 18-19 1997 | Evaluation, Quantitative -- Descriptive: Collect data from tests with Fort Pitt Elementary students | Completed
| |
Apr 20 1997 | Evaluation, Quantitative -- Descriptive: Example of "invisible experiment" on
effect of backchanneling | Completed
| |
TBA | Evaluation, Quantitative -- Comparative: Deployment at Fort Pitt | Canceled (1)
| |
TBA | Evaluation, Quantitative -- Comparative: Comparison of data with old tutor to data with new tutor | Canceled
| |
(1)
The Reading Tutor is deployed, but no comparative evaluation is planned.
Presentation and Documentation
Expected Date | Description | Status | Relevant Links |
Apr 25 1997 | User Manual | Outlined | |
Apr 25 1997 | System Documentation | Designed | System Documentation |
Apr 25 1997 | Final Presentation | | |
Apr 25 1997 | System Demonstration | | |
May 5 1997 | Final report | Conceptualized | |
Status: one of {Conceptualized, Postponed, Designed, Written, Tested, Integrated}