He will not sign or seal plans or specifications prepared by someone
other than himself or an employee under his supervision.
[See Code
II.2.b.
]
- Code is relevant when:
- Engineer signs or seals plans or specifications
- Code is violated when:
- The plans or specifications were not prepared by the Engineer
AND
The plans or specifications were not prepared by an employee under the supervision of the Engineer
- Code is not violated when:
- The plans or specifications were prepared by the Engineer
OR
The plans or specifications were prepared by an employee under the supervision of the Engineer
[Index to All Codes]
[Back to previous canon or rule]
[Forward to next canon or rule]