He will not represent as his own the plans, designs, or
specifications supplied to him by a manufacturer or supplier of
equipment or material.
[See Codes
14.,
III.10.
]
- Code is relevant when:
- Engineer is supplied with plans, designs, or specifications by a manufacturer or supplier
- Code is violated when:
- Engineer represents as his own the plans, designs, or specifications
- Code is not violated when:
- Engineer does not represent as his own the plans, designs, or specifications
[Index to All Codes]
[Back to previous canon or rule]
[Forward to next canon or rule]